Simkosh Khola Hydroelectric Project (3.45 MW)

Simkosh Khola Hydroelectric Project (3.45 MW)

The project is being developed by Simkosh Hydropower Pvt. Ltd. The project area lies in the Dhaulagiri Rural Municipality in Myagdi district of Nepal, 218 km west of Kathmandu. The proposed Simkosh Khola Hydroelectric Project has been planned as a simple Peaking (4 hr) Run-of the-River(PRoR) type project. It has an installed capacity of 3.45 MW.  The RCOD of the project is on 2083-11-07 .

The project is located in a remote area with no settlements upstream of the intake. Thus no adverse social impacts are anticipated during project implementation. 

The project envisages special capacity building activities and trainings for the local residents to enable them to adapt to climate change and use appropriate, up-to-date mitigation/adaptation technologies. Estimated 133,875 kg CO2e will be monthly avoided, in terms of project lifeline, which will result in 48,195 tonnes CO2e mitigation.

Salient Features of the Proposed Project

Name of Project

Simkosh Khola Hydroelectric Project

Design Head

330 m

Design Discharge

1.5 m3/ sec

Installed Capacity

3.45 MW 4 hours peaking storage (PRoR)

Total Project Cost

USD  5,310,000.00 (Approx)

Dry Season Energy

7.67 GWh

Wet Season Energy

14.41 GWh

Average Annual Energy after Outage

22.08 GWh (Approx)

Annual Sales on CoD date

154.97 (MNPR)

Proposed Loan Equity Ratio

70:30

Internal Rate of Return (IRR)

14.7%

Return on Equity (ROE)

24.84%

Debt Service Coverage Ratio (DSCR)

1.85 times (185%) in twelve years' average

Interest Service Coverage Ratio

7.26 times (726%)

Payback Period

5.77 years which is amongst the lowest in Nepal

 

Project Status

The key activities in the development stage of the proposed project and their status are presented in the table below. 

 

Project Development Stage Activities and Their Status

S.N

Activity/Item

Prerequisites

Status

  1.  

Identification of the Project

Study and Field visit

Completed

  1.  

Survey License


Generation License

Field Visit and Desk Study Report

PPA/IEE/FC

Obtained


FC Under Progress

  1.  

Feasibility Study

Survey, feasibility, Design Study Report

Completed 

  1.  

Detail Design

Detail Engineering Report

Completed

  1.  

Clearances: Environmental, Forest

IEE Studies

Ongoing

  1.  

PPA with NEA

Agreement:

Signed on 2079-11-11