Energiso
icon
Phone No:

( +977 014370778 )

icon
Email Address:

barahi.hydro@gmail.com

Theule Khola Hydroelectric Project, 1.5 MW

Theule Khola Hydroelectric Project, 1.5 MW

The Theule Khola Hydroelectric Project, 1.5 MW is a Run-off-River (ROR) Project, with an installed
capacity of 1.5 MW. The project site is Located at Kushmishera, Binamare and Sarkuwa VDC (Now
Jaimini Nagar Palika) of Baglung District, Dhaulagiri Zone. The site is accessible by road and is about
85 km from Pokhara Sub-Metropolitan City. At Present the proposed head works site is connected with
all season black topped road, which is about 20 km from Baglung (65 km is black top road which connects Pokhara and Baglung). 
The Project is in commercial Operation since 2075/03/24.
The Project involved the following institutions for the implementation of the project.
a. Samyak Engineering Pvt. Ltd. as design and Quality Control Consultant
b. TAC Hydro and ADMC Engineering Pvt. Ltd. as Hydromechanical Construction Supervision Consultant 
c. Asia Pacific Power Tech China as Electromechanical Design and Supply (Design Built Contract )
d. CBM India and Ratnamani Steel Industries Ltd., India as Metal works and Penstock Pipe Supplier

The features of the projects are:

1 Name of Project Theule Khola Hydroelectric Project, 1.5 MW
2 Contract Energy 8.217 GWh
3 Project Developed by Barahi Hydropower Public Ltd. Babarmahal, Kathmandu
4 Project Type ROR
4.1 Coordinate 83°36' E to 83°38' 25" E and 28° 10' 20" N to 280 11' 10"N
4.2 Location Kushmisera, Binamare and Sarkuwa VDC (Jaimini Municipality)
4.3 Project Financed by: Deva Development Bank Ltd. (Now Kumari Bank Ltd.) & Its Consortium
5 Acquired Land Area 35.80 Ropanies
7 Commercial Operation Date 2075/03/24